Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

Free Jun-2024 UPDATED SAP C-TS422-2022 Certification Exam Dumps is Online [Q21-Q43]

Share

Free Jun-2024 UPDATED SAP C-TS422-2022 Certification Exam Dumps is Online

SAP Exam 2024 C-TS422-2022 Dumps Updated Questions

NEW QUESTION # 21
Which of the following elements does MRP take into account during net requirement calculation? Note:
There are 2 correct answers to this question.

  • A. Forecast key figures
  • B. Maximum stock level
  • C. Safety Stock
  • D. Purchase orders

Answer: C,D

Explanation:
MRP (Material Requirements Planning) is a process that calculates the quantity and timing of material requirements based on the demand and supply situation. MRP performs a net requirement calculation for each material, which compares the available stock and the planned receipts with the requirements and the planned issues. MRP takes into account the following elements during net requirement calculation:
Safety stock: The minimum quantity of material that should be maintained at all times to avoid stockout situations due to unforeseen fluctuations in demand or supply. MRP considers the safety stock as a requirement and tries to replenish it whenever it falls below the defined level.
Purchase orders: The confirmed orders from external vendors that are expected to be delivered within a certain time frame. MRP considers the purchase orders as planned receipts and reduces the net requirement by the quantity and date of the purchase orders.
MRP does not take into account the following elements during net requirement calculation:
Forecast key figures: The projected demand for a material based on historical data, trends, and other factors. MRP does not consider the forecast key figures as requirements, but as a basis for creating planned independent requirements, which are then considered as requirements.
Maximum stock level: The maximum quantity of material that should be maintained at any time to avoid overstocking and excess inventory costs. MRP does not consider the maximum stock level as a constraint, but as a target value for the lot-sizing procedure, which determines the optimal quantity and frequency of replenishment orders.
References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 86; [SAP Help Portal: Net Requirements Calculation].


NEW QUESTION # 22
During production order creation, several valid production versions are found. How does the system choose the production version?

  • A. Validity period or sales order
  • B. Alphanumeric or quota arrangement
  • C. Planned order or material number
  • D. Lot size or material cost

Answer: A

Explanation:
The system chooses the production version based on the validity period and the sales order. The validity period determines whether the production version is valid for the planned start date of the production order.
The sales order determines whether the production version is assigned to a specific sales order item or not. If there are multiple production versions that meet these criteria, the system chooses the one with the lowest alphanumeric value. References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 113; [SAP Help Portal: Production Version]


NEW QUESTION # 23
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question

  • A. Define the special procurement type inside the BOM
  • B. Change the item category of the phantom assembly in the bill of material *-' (BOM)
  • C. Define the special procurement type inside the material master.
  • D. Change the phantom item indicator for the phantom assembly in the bill of material (BOM)

Answer: C,D

Explanation:
A phantom assembly is a material that is not physically produced, but its components are directly consumed in the production of a higher-level material. To set up a material as a phantom assembly, you need to do the following steps:
Define the special procurement type as 50 (phantom assembly) in the material master of the phantom assembly. This indicates that the material is not procured or produced, but its components are exploded in the BOM of the higher-level material.
Change the item category of the phantom assembly in the BOM of the higher-level material to N (phantom item). This indicates that the phantom assembly is not relevant for production order or MRP, but its components are.
Alternatively, you can change the phantom item indicator for the phantom assembly in the BOM of the higher-level material to X (phantom assembly). This has the same effect as changing the item category to N, but it also allows you to use the same BOM for different purposes, such as costing or sales.
References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 68;
[SAP Help Portal: Phantom Assembly].


NEW QUESTION # 24
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

  • A. Bill of material (BOM)
  • B. Work Center
  • C. Routing
  • D. Material Master

Answer: B,C

Explanation:
The duration of an operation for production is determined by the combination of data maintained in the routing and the work center. The routing defines the sequence of operations, the work centers, and the standard values for each operation, such as setup time, processing time, and teardown time. The work center defines the capacity, the formulas, and the scheduling parameters for each operation, such as base quantity, operation rate, and queue time. The system calculates the duration of an operation by multiplying the standard values from the routing by the factors from the work center formulas and adding the scheduling parameters from the work center. For example, if the routing specifies a processing time of 10 minutes per unit and the work center formula is processing time = (processing time / base quantity) * operation quantity, and the base quantity is
100 units, then the duration of the operation for 50 units is (10 / 100) * 50 = 5 minutes.
The bill of material (BOM) and the material master (D) are not data objects that determine the duration of an operation for production. The BOM defines the components and the quantities that are required for producing a material. The material master defines the general and specific attributes of a material, such as the material type, the unit of measure,the MRP data, and the production data. These data objects are relevant for planning the material requirements and the production costs, but not the operation duration. References:
https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/c00ad2cac7be4ef29a4461ba114e4f91/051ebf53d25ab
https://learning.sap.com/learning-journeys/manage-production-orders-in-sap-s-4hana-manufacturing/scheduling-


NEW QUESTION # 25
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

  • A. The MRP run assumes in-house production.
  • B. The MRP run assumes external procurement.
  • C. The MRP run does NOT consider the material; it has to be planned interactivelty
  • D. The MRP run plans the material only if a quotation has been maintained.

Answer: A,B


NEW QUESTION # 26
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?

  • A. Planning with final assembly (40)
  • B. Make-to-stock production (10)
  • C. Make-to-stock production (20)
  • D. Planning without final assembly (50)

Answer: B

Explanation:
Make-to-stock production (10) is a planning strategy that supports the production of a finished good based on a forecast and without any reference to sales orders. This strategy is used when the finished good has a stable and predictable demand, and the company wants to maintain a certain level of safety stock to meet customer orders. If customers order more than the forecasted quantity, this does not affect the production program, as the system does not generate any additional planned orders or purchase requisitions for the finished good.
Instead, the system reduces the planned independent requirements by the sales order quantity, and the excess demand is covered by the safety stock or the available stock. This strategy allows for a smooth and continuous production process, and avoids frequent changes in the production plan. References: Make-to-Stock Production | SAP Help Portal, Planning Strategies | SAP Help Portal, SAP S/4HANA Production Planning and Manufacturing Certification Guide, page 52.


NEW QUESTION # 27
What do you need to consider when working with material master numbering in SAP S/4HANA?
Note: There are 2 correct answers to this question.

  • A. The maximum material number length is 40 for external numbers and 18 for internal numbers
  • B. Material numbering is defined cross-client.
  • C. The maximum material number length is 18 for external numbers and 18 for internalnumbers.
  • D. Material numbering is defined at client level.

Answer: A,D


NEW QUESTION # 28
How can you characterize dependent requirements in material requirements planning?
Note: There are 2 correct answers to this question.

  • A. They are only created for multilevel bill of material (BOM) structures
  • B. They are created with exact times in Advanced Planning.
  • C. They are created on assembly level during the planning run.
  • D. They are created when an independent requirement is created for the finished product.

Answer: C,D


NEW QUESTION # 29
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?

  • A. Which base unit of measure does the material have?
  • B. In which storage location is the BOM required?
  • C. What status does the BOM have?
  • D. Is the material type allowed in the BOM?

Answer: A,D


NEW QUESTION # 30
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question

  • A. WBS item
  • B. Non-stock item
  • C. Variable-size item
  • D. Work item

Answer: B,C

Explanation:
You can select the following standard item categories inside a bill of material (BOM):
Variable-size item: This item category is used for materials that have variable dimensions, such as pipes, wires, or fabrics. The system calculates the quantity of the variable-size item based on the formula and the dimensions entered in the BOM. You can also use the variable-size item to define a scrap percentage for the material.
Non-stock item: This item category is used for materials that are not managed in inventory, such as consumables, services, or subcontracting items. The system does not create any reservations or stock movements for the non-stock item. You can use the non-stock item to trigger purchasing requisitions or purchase orders for the material. References: Bill of Material Item Category; Bills of Material in Production Planning


NEW QUESTION # 31
You want to set up a make-to-order planning scenario for a finished material. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

  • A. Choose planning strategy 50 (Planning without final assembly) and select the - corresponding Individual/Collective indicator.
  • B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.
  • C. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.
  • D. Choose planning strategy 20 (Make-to-Order) and select the corresponding ndividual/Collective indicator.

Answer: A


NEW QUESTION # 32
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question.

  • A. Form optimum sequence to reduce setup times.
  • B. Increase the capacity supply in a time-phased interval.
  • C. Determine a time period with available capacity on the planning board.
  • D. Reduce the planning Window.
  • E. Execute an infinite production planning run for the critical resources.

Answer: A,B,C


NEW QUESTION # 33
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.

  • A. Use the Batch Information Cockpit.
  • B. Use the batch where-used list.
  • C. Use batch determination
  • D. Use batch derivation.

Answer: A,B


NEW QUESTION # 34
What is the purpose of a reporting point confirmation in repetitive manufacturing?
Note: There are 2 Correct answers to this question?

  • A. To stage different components for a production line simultaneously
  • B. To provide timely updates of inventory management for the staged components
  • C. To reduce the total production lead time for a long production line
  • D. To determine the work in progress along the production line

Answer: B,D


NEW QUESTION # 35
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  • A. Fill up to the maximum stock level.
  • B. Fill up to the safety stock level.
  • C. Fill up based on the lot size procedure.
  • D. Fill up to the reorder stock level.

Answer: C


NEW QUESTION # 36
where does the system check master data selection settings during the creation of planned orders and production orders?
Note: There are 3 Correct answers to this question.

  • A. in the MRP controller
  • B. in the work centers
  • C. in the production version
  • D. in the bill of material (BOM)
  • E. In the routing

Answer: A,D,E


NEW QUESTION # 37
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planned order's component availability is checked.
  • B. The planned order generates capacity requirements
  • C. The planned order is converted to a production order.
  • D. The planned order's components are copied to the picking list.

Answer: B


NEW QUESTION # 38
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

  • A. The same batch management level is used
  • B. The same base unit of measure is used.
  • C. The same account category is used
  • D. The quantity and value updates are the same

Answer: C,D


NEW QUESTION # 39
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing?
Note: There are 2 Correct answers to this question?

  • A. Run MRP with quota arrangement
  • B. Assign planned orders manually in the planning table
  • C. Assign planned orders manually in the planning table
  • D. Run PP/DS heuristic for repetitive manufacturing

Answer: C,D

Explanation:
Run PP/DS heuristic for repetitive manufacturing: PP/DS (Production Planning and Detailed Scheduling) is a component of SAP S/4HANA that provides advanced planning and scheduling functions for complex production scenarios. You can run the PP/DS heuristic for repetitive manufacturing to automatically assign planned orders to production lines based on the available capacity, material, and sequence constraints. The PP/DS heuristic also optimizes the line utilization and minimizes the setup times and costs.
Assign planned orders manually in the planning table: The planning table is a graphical tool that allows you to view and manipulate the production plan for repetitive manufacturing. You can assign planned orders manually to production lines by dragging and dropping them in the planning table. You can also adjust the start and finish dates, quantities, and sequences of the planned orders. The planning table shows the capacity situation and the material availability for each production line.
You cannot plan both quantities and capacities during line loading in repetitive manufacturing by using the following options:
Run MRP with quota arrangement: MRP (Material Requirements Planning) is a process that calculates the quantity and timing of material requirements based on the demand and supply situation.
You can run MRP with quota arrangement to distribute the total requirements for a material among multiple sources of supply, such as vendors, plants, or production lines. However, MRP does not consider the capacity constraints or the sequence dependencies of the production lines, and therefore cannot plan the capacities during line loading.
Assign planned orders manually in the planning table: This option is identical to option C and therefore cannot be a correct answer.
References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], pages 105-106;
[SAP Help Portal: Line Loading in Repetitive Manufacturing].


NEW QUESTION # 40
which SAP application can be used for forecasting in Supply Chain Planning?
Note: there are 2 correct answers to this question.

  • A. Material Requirement Planning (MRP)
  • B. Capacity Requirement Planning (CRP)
  • C. Supply Chain Management (SCM)
  • D. Integration Business Planning (IBP)

Answer: C,D

Explanation:
Forecasting is the process of predicting future demand for products or services based on historical data, market trends, and other factors. Forecasting is an essential component of supply chain planning, which aims to optimize the flow of materials, information, andmoney across the supply chain network. SAP offers various applications that can be used for forecasting in supply chain planning, such as:
Integration Business Planning (IBP): IBP is a cloud-based solution that provides end-to-end visibility and integration of planning processes across different business functions, such as sales, finance, operations, and logistics. IBP enables collaborative and real-time forecasting, scenario analysis, and decision making based on advanced analytics and machine learning. IBP supports various forecasting methods, such as statistical, causal, and demand sensing, and allows users to adjust and refine forecasts based on changing market conditions and business priorities12.
Supply Chain Management (SCM): SCM is an on-premise solution that covers the entire supply chain process, from demand planning to delivery and invoicing. SCM includes various modules, such as Advanced Planning and Optimization (APO), Extended Warehouse Management (EWM), and Transportation Management , that enable efficient and flexible planning and execution of supply chain activities. SCM supports various forecasting techniques, such as exponential smoothing, trend analysis, and seasonal adjustment, and allows users to monitor and control forecast accuracy and performance34.
The other two options are not SAP applications, but rather concepts or processes related to supply chain planning:
Capacity Requirement Planning (CRP): CRP is the process of determining the available and required capacity of resources, such as machines, labor, and materials, to meet the production plan. CRP helps to identify and resolve capacity bottlenecks, optimize resource utilization, and balance supply and demand. CRP can be performed using various SAP applications, such as MRP, Production Planning and Detailed Scheduling (PP/DS), or IBP5 .
Material Requirement Planning (MRP): MRP is the process of calculating the quantity and timing of materials needed to fulfill the production plan. MRP helps to optimize inventory levels, reduce costs, and improve customer service. MRP can be performed using various SAP applications, such as ERP, SCM, or IBP . References: SAP Integrated Business Planning | SAP, Forecasting | SAP Help Portal, SAP Supply Chain Management | SAP, Forecasting | SAP Help Portal, Capacity Requirements Planning (PP-CRP) | SAP Help Portal, [Capacity Planning | SAP Help Portal], [Material Requirements Planning (PP-MRP) | SAP Help Portal], [Material Requirements Planning | SAP Help Portal]


NEW QUESTION # 41
Which of the following processes lead to an entry in the MRP planning file?
Note: There are 3 correct answers to this question.

  • A. Changing the stock in inventory management
  • B. Changing the storage bin in warehouse management
  • C. Changing the operation times in the production data structure
  • D. Changing the procurement type in the product master
  • E. Changing the purchasing contract in materials management

Answer: A,C,D


NEW QUESTION # 42
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

  • A. Bill of material (BOM)
  • B. Work Center
  • C. Routing
  • D. Material Master

Answer: B,C


NEW QUESTION # 43
......

SAP Certified C-TS422-2022  Dumps Questions Valid C-TS422-2022 Materials: https://www.dumptorrent.com/C-TS422-2022-braindumps-torrent.html

Get The Most Updated C-TS422-2022 Dumps To SAP Certified Application Associate Certification: https://drive.google.com/open?id=1n9BK3O9Y-DV_znTXT8IjiFUR3CVgyIIC