In which three applications can Asset Depreciation be configured?
- A. Item Master
- B. Assets
- C. Locations
- D. Tools
- E. Asset Templates
- F. Chart of Accounts
Answer: B,C,E
Explanation:
Asset Depreciation can be configured in three applications in IBM Maximo Manage v8.0 according to IBM's documentation. These applications are:
Asset Templates
Assets
Locations
NEW QUESTION # 17
In the Organizations application, which action is used to create Inventory Usage documents for new reservations?
- A. Inventory Usage Options
- B. Inventory Options
- C. Work Order Options
- D. Reservation Options
Answer: D
Explanation:
In the Organizations application in IBM Maximo Manage, you should use Reservation Options to create Inventory Usage documents for new reservations.
NEW QUESTION # 18
What are three available associations in the Hazards application?
- A. Material Safety Data Sheets (MSDS)
- B. Hazardous Materials
- C. Tag Outs
- D. Lock Outs
- E. Precautions
- F. Safety Plans
Answer: A,B,E
Explanation:
The Hazards application in IBM Maximo Manage v8.0 allows users to associate Material Safety Data Sheets (MSDS), Hazardous Materials, and Precautions with a particular hazard. These associations help in managing safety information related to hazards and in ensuring compliance with safety regulations.
NEW QUESTION # 19
In what Maximo Manage application are the specifications of an asset for calibration entered?
- A. Asset
- B. Improvements
- C. Data Sheet Template
- D. Classifications
Answer: C
Explanation:
In IBM Maximo Manage, the specifications of an asset for calibration are entered in the Data Sheet Template application.
NEW QUESTION # 20
How is the Lock Out / Tag Outs application structured?
- A. Specify a Tag Out on the Location or Asset and define the Lock Out Operations.
- B. Define the isolation procedures on a set of related assets and specify a sequence.
- C. Specify a Lock Out on the Location or Asset and define the Tag Out Operations.
- D. Specify a Lock Out on an Asset with a Locking Device and define the Tag Out Operations.
Answer: C
Explanation:
In IBM Maximo Manage v8.0 implementation, the Lock Out / Tag Out application is structured such that you specify a Lock Out on the Location or Asset and define the Tag Out operations. This application is used to manage the procedures and controls put in place to protect personnel from injury due to unintended or inadvertent equipment or system operation.
NEW QUESTION # 21
What is the purpose of the Admin mode?
- A. change System Properties without needing to shut down the Maximo server
- B. perform Database Configuration without needing to shut down the Maximo server
- C. perform administrative functions
- D. apply changes in Application Designer
Answer: B
Explanation:
The purpose of Admin mode in IBM Maximo Manage is to allow users to perform Database Configuration without needing to shut down the Maximo server.
NEW QUESTION # 22
At what database level does a Job Plan exist?
- A. SITE
- B. SYSTEM
- C. SYSTEMORGSITE
- D. ORG
Answer: A
Explanation:
A Job Plan exists at the SITE level in IBM Maximo Manage.
NEW QUESTION # 23
When a Service Level Agreement is applied to a WORKORDER object, what Commitment Type will be missing from the lookup?
- A. CONTACT
- B. DOWNTIME
- C. AVAILABILITY
- D. DELIVERY
Answer: D
Explanation:
When a Service Level Agreement (SLA) is applied to a WORKORDER object in IBM Maximo Manage v8.0 implementation, the Commitment Type that will be missing from the lookup is DELIVERY. The other possible Commitment Types in Maximo Manage are DOWNTIME, AVAILABILITY, and CONTACT.
NEW QUESTION # 24
Apart from Standard and Average, what other three costing methods can be used in the Inventory application?
- A. Weighted Average
- B. FIFO
- C. Asset
- D. FILO
- E. LILO
- F. LIFO
Answer: A,B,F
Explanation:
Apart from Standard and Average costing methods in IBM Maximo Manage's Inventory application, three other costing methods that can be used are FIFO (First In First Out), LIFO (Last In First Out) and Weighted Average.
NEW QUESTION # 25
Which statement is true regarding Master Preventative Maintenance (PM) records?
- A. Associated PM records are temporary and expire after 90 days.
- B. Associated PM records can be created for a Master PM which does not have an item
- C. Associated PM records can only be created for a rotating item's asset.
- D. Associated PM records can only be created for a rotating item's location.
Answer: B
Explanation:
Regarding Master Preventative Maintenance (PM) records in IBM Maximo Manage, associated PM records can be created for a Master PM which does not have an item.
NEW QUESTION # 26
In which application can a Contract property default be set for a specific contract type, for example Is early termination allowed by the Customer?
- A. System Properties
- B. Database Configuration
- C. Organizations
- D. Contract Administration
Answer: D
Explanation:
The Contract Administration application is used to set contract property defaults for specific contract types. For example, you can set whether early termination is allowed by the customer for a specific contract type.
NEW QUESTION # 27
What are the three usage types in the Inventory Usage application?
- A. MOVE
- B. ISSUE
- C. TRANSFER
- D. STAGED
- E. MIXED
- F. RECEIV
Answer: B,C,D
Explanation:
In IBM Maximo Manage v8.0 implementation, the usage types in the Inventory Usage application are ISSUE, STAGED, and TRANSFER. ISSUE is used to relieve items from inventory for use in maintenance or other processes. STAGED is used to reserve items for future use. TRANSFER is used to move items from one inventory location to another, typically within the same organization.
NEW QUESTION # 28
In which status can a Job Plan be modified to add a new task?
- A. INACTIVE
- B. REVISED
- C. NEW
- D. PNDREV
Answer: B
NEW QUESTION # 29
What is a licensing method used to obtain the Maximo Asset Suite?
- A. User credits license
- B. Cloud based license
- C. Monthly license
- D. Feature based license
Answer: B
Explanation:
One licensing method used to obtain the Maximo Asset Suite is a Cloud based license.
NEW QUESTION # 30
In which two places can Service Request Categories be created for use in the Service Request Work Center?
- A. Classifications Application
- B. Service Catalog Application
- C. Administration Work Center
- D. Business Analysis Work Cen
- E. Service Desk Application
Answer: B,C
Explanation:
In IBM Maximo Manage, Service Request Categories can be created for use in the Service Request Work Center in two places - the Administration Work Center and the Service Catalog Application.
NEW QUESTION # 31
Which two records can be included as a contract line item on a Lease/Rental Contract?
- A. Rotating item
- B. Non-Rotating item
- C. Asset
- D. Non-Rotating Asset
- E. Tool
Answer: A,C
Explanation:
In IBM Maximo Manage, two records that can be included as a contract line item on a Lease/Rental Contract are a Rotating item and an Asset.
NEW QUESTION # 32
How can a Master Preventive Maintenance record be associated with multiple non-rotating assets?
- A. Use the Move/Modify Assets action.
- B. Add the Assets to the Multiple Assets table on the Master Preventive Maintenance record.
- C. Use an Asset Template.
- D. Use the Apply Down Hierarchy action on the Master Preventive Maintenance record.
Answer: B
Explanation:
To associate a Master Preventive Maintenance record with multiple non-rotating assets, we can add the assets to the Multiple Assets table on the Master Preventive Maintenance record. This allows us to associate the preventive maintenance schedule with multiple assets, ensuring that the maintenance activities are performed on each of the associated assets as scheduled.
NEW QUESTION # 33
Which Maximo application can be used to generate replacement plans for assets?
- A. Maximo Health
- B. Maximo Health, Safety and Environmental (HSE)
- C. Maximo Manage
- D. Maximo Predict
Answer: A
Explanation:
The Maximo Health application can be used to generate replacement plans for assets.
NEW QUESTION # 34
To what type of objects can a Service Level Agreement be applied?
- A. only the objects based on the Work Order or Ticket Classes
- B. only the Main Object that are Internal
- C. only the objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items
- D. any Main Object
Answer: C
Explanation:
A Service Level Agreement can be applied only to objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items.
NEW QUESTION # 35
What happens if the Specification of a rotating item is updated in the Item Master application?
- A. Only locations inherit the specification from a rotating item and only when new locations are created. Assets only inherit the specification from an asset template.
- B. New locations and assets that reference the rotating item will inherit the changes, there are no changes to existing locations and assets.
- C. By default, all locations and assets referencing the rotating item will be updated with the changes.
- D. By default, existing assets referencing the rotating item will be updated with the changes, there are no changes to existing locations.
Answer: B
Explanation:
If the Specification of a rotating item is updated in the Item Master application, new locations and assets that reference the rotating item will inherit the changes. There are no changes to existing locations and assets.
NEW QUESTION # 36
What are the three default classes of a Ticket?
- A. Problem
- B. Change
- C. Activity
- D. Incident
- E. Service Request
- F. Release
Answer: A,D,E
Explanation:
The three default classes of a Ticket in IBM Maximo Manage are Problem, Service Request and Incident.
NEW QUESTION # 37
When using flow control on a Work Order, how ca from the Parent to Child Work Orders?
user ensure that Work Order status changes are inherited
- A. Ensure the Asset or Location
on both the Parent and Child Work Order. - B. Check the Roll Down Status Changes flag on the Parent and Child Work Order.
- C. Check the Inherit Status Changes flag on the Work Order and ensure the mxe.app.wo.flowControlStatuslnheritance System Properties is set to 1.
- D. In the Organization application, check the Intarit Status Changes flag in Work Order Options -> Flow Control Options.
Answer: D
Explanation:
When using flow control on a Work Order in IBM Maximo Manage, to ensure that Work Order status changes are inherited from the Parent to Child Work Orders, you should go to the Organization application and check the Inherit Status Changes flag in Work Order Options -> Flow Control Options.
NEW QUESTION # 38
......
Authentic Best resources for C1000-132 Online Practice Exam: https://www.dumptorrent.com/C1000-132-braindumps-torrent.html
Get the superior quality C1000-132 Dumps Questions from DumpTorrent: https://drive.google.com/open?id=1VBJDlP28fv-p7MYCRq4LddkwN4j4itRF