
Use Real C-IBP-2311 - 100% Cover Real Exam Questions [Aug-2024]
Dumps Brief Outline Of The C-IBP-2311 Exam - DumpTorrent
NEW QUESTION # 34
Which planning operators can be executed in a time-series-based planning area? Note: There are 2 correct answers to this question
- A. Constrained Forecast Run
- B. Finite Heuristics
- C. Deployment Optimizer
- D. Shelf Life Heuristics
Answer: A,B
NEW QUESTION # 35
You are reviewing the master data types that are often used for supply and inventory planning. Which master data types are compound master data types? Note: There are 2 correct answers to this question
- A. SOURCECUSTOMER
- B. SOURCELOCATION
- C. SOURCEPRODUCTION
- D. SOURCECUSTGROUP
Answer: A,B
NEW QUESTION # 36
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
- B. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
- C. Number of fair share segments Additional tiering costs (default) Inventory days of supply
- D. Number of fair share segments Additional tiering costs (default) Maximum inventory
Answer: A
NEW QUESTION # 37
What are the possible Master Data Maintenance options for SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question
- A. The data Integration job app
- B. The Planner Workspaces app
- C. The Manage Master Data app
- D. The Planning Areas Model Configuration app
- E. The SAP IBP, add - in for Micorsoft Excel
Answer: A,C,E
NEW QUESTION # 38
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question
- A. Transportation lead time
- B. Aggregated constraints
- C. Adjusted transportation receipts
- D. Minimum lot size
- E. Maximum lot size
Answer: A,C,D
NEW QUESTION # 39
Which of the following checks for master data and key figures does the Check Mode algorithm trigger? Note: There are 3 correct answers to this question.
- A. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network
- B. It checks whether the sourcing in the Production Source Item master data type exists.
- C. It reports input key figure for which no related master data exists.
- D. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network
- E. It checks whether the location resource specified in the master data forms a cycle in the supply chain network
Answer: A,B,D
NEW QUESTION # 40
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct answers to this question.
- A. Assign the compound master data type and its component master data types
- B. Configure at most two input key figures on the same planning level in a key figure calculation
- C. Specify a planning horizon in the planning area for each level of the assigned time profile
- D. Configure at least one calculated key figure for the planning area
Answer: A,C
NEW QUESTION # 41
You are developing the functionality and appearance of the Excel UI for SAP IBP business users. Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding? Note:There are 2 correct answers to this question.
- A. Changing the member names
- B. Changing the layout of the master data workbooks
- C. SAP IBP ribbon extension
- D. Chaging the entries from the Name Manager
Answer: B,C
NEW QUESTION # 42
Analytics charts are created by the user in the Advanced Analytics application. What can the user do in the Advanced Analytics app? Note: There are 2 correct answers to this question.
- A. Merge charts together.
- B. Group Data
- C. Applying filters on there data
- D. Trigger export to Manage Analytics stories
Answer: B,C
NEW QUESTION # 43
What is a prerequisite for modelling outsourced manufacturers with production capacity using the Supply Optimizer?
- A. Use production lead times and offsets to manage components at the outsourced manufacturing location
- B. Model relative production costs across internal locations and outsourced manufacturing locations
- C. Model target inventory and stocks at the outsourced manufacturing location
- D. Ensure that the outsourced manufacturing locations have a separate subnetwork
Answer: B
NEW QUESTION # 44
Which of the following are features of lag-based snapshots? Note: There are 2 correct answers to this question
- A. Target key figure for these snapshots are expressed to the user in planning view
- B. Target key figure for these snapshots must have lag as root attribute in the base planning leve
- C. Lag-based snapshots are created in the Configuration app for a fixed time range.
- D. The number of lag-based snapshots are limited to nine levels.
Answer: A,B
NEW QUESTION # 45
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to thePERPRODCUST level. Which of the following configuration options are possible for this process? Note: There are 2 correct answers to this question
- A. Splitting the values form aggregated to detailed level, based on the time profile attribute
- B. Splitting the values from detailed to aggregated level by using a copy operator
- C. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
- D. Splitting the values from aggregated to detailed level using multiplication by the proportions
Answer: C,D
NEW QUESTION # 46
What are some of the key capabilities of SAP Integrated Business Planning for demand? Note: There are 3 correct answers to this question.
- A. Statistical analysis using the predictive analytics tools
- B. Determination of coefficient of variation (CV)
- C. Embedded, on-the-fly demand analytics
- D. Classifying demand into zones
- E. Automated, exception- based processing
Answer: B,C,E
NEW QUESTION # 47
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand. Which solutions would apply to this scenario? Note: There are 2 correct answers to this question.
- A. Excess stock can be generated and will need to be staged in an overflow warehouse
- B. Minimum capacity utilization will result in pull production
- C. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs
- D. Capacity leveling will be possible for production and storage resources.
Answer: A,C
NEW QUESTION # 48
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question
- A. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"
- B. Identify inventory items that quire closer attentions
- C. Choose time-independent key figures as segmentation measures
- D. Substitute missing values in case of sporadic demands.
Answer: B,C
NEW QUESTION # 49
What are some of the capabilities of the Planner Workspaces app? Note: There are 2 correct answers to this question.
- A. It supports embedding analytic stories as a workspace component
- B. It supports simulating the effect of the changes
- C. It supports favourites created in SAP IBP, add-in for Microsoft Excel
- D. It supports sharing with other users or user groups.
Answer: A,C
NEW QUESTION # 50
Which prerequisites must be met to maintain data types via the SAP IBP, add-in for Microsoft Excel?
Note: There are 2 correct answers to this question
- A. Restriction types are set correctly
- B. An applicable business catalogue is assigned to your business role
- C. The Inquire tab is activated in Microsoft Excel
- D. The Normalized setting is available in the Planning Area
Answer: B,C
NEW QUESTION # 51
A time profile is defined with these levels: day, technical week, week, month, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF ("PERIODIDl"="SSPERIODIDICUSS...)
- B. IF (,,PERIODID3"="SSPERIODID2CUSS...)
- C. IF (,,PERIODID2"="SSPERIODID2CUSS...)
- D. IF ("PERIODID4"="SSPERIODIDICUSS...)
Answer: D
NEW QUESTION # 52
You are starting a new implementation project for SAP IBP and are considering the possible system architecture. What are the possible approaches for setting up the system landscape? Note: There are 2correct answers to this question
- A. Create additional test planning areas in the production system to support cutover needs
- B. Create additional planning areas in the test system to support training needs.
- C. Set up a three-tier landscape using transport, starting from the development system to test and - production
- D. Setup the two-tier landscape and have the configuration for development system regularly - updated from the production system
Answer: B,C
NEW QUESTION # 53
What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct answers to this question.
- A. Link two analytics charts.
- B. Use drill-down functionality
- C. Display all assigned analytics on a single UI
- D. Rename the charts
- E. Add Process instances
Answer: B,C,E
NEW QUESTION # 54
What is taken as an input for the demand sensing process? Note: There are 2 correct answers to this question.
- A. Forecast Accuracy measures
- B. Consensus Demand
- C. Results of time series analysis
- D. Open Sales Order
Answer: B,D
NEW QUESTION # 55
Which Maintenance, Repair, and Overhaul (MRO) parts planning processes are included in SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question.
- A. SAP Intelligent Asset Management
- B. Supply Planning
- C. Demand Planning
- D. Demand Driven Replenishment
- E. Inventory Optimization
Answer: B,C,E
NEW QUESTION # 56
Which Master Data Types are used in time-series-based planning within SAP IBP for response and supply? Note: There are 3 correct answers to this question
- A. Product
- B. Customer
- C. Location
- D. Transportation lane
- E. DS Order fulfilment
Answer: A,B,C
NEW QUESTION # 57
Which of the following solutions should be satisfied with violations penalized by the objective function ofthe time-series supply optimizer? Note: There are 3 correct answers to this question. Not adhering to maximum transport values
- A. Violation of minimum resource utilization
- B. Violation of minimum aggregated inventory vales
- C. Not-fully satisfied demands
- D. Not respecting production capacity
Answer: A,B,C
NEW QUESTION # 58
Which apps can be enhanced with analytical charts? Note: There are 2 correct answers to this question.
- A. Intelligent visibility
- B. Web-based Planning
- C. Dashboards Advanced
- D. Planner Workspace
Answer: C,D
NEW QUESTION # 59
......
SAP C-IBP-2311 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
Certification Training for C-IBP-2311 Exam Dumps Test Engine: https://www.dumptorrent.com/C-IBP-2311-braindumps-torrent.html
C-IBP-2311 Training & Certification Get Latest SAP Certified Application Associate : https://drive.google.com/open?id=1PsdLMXYYdIuDzfJJgZDVX1d_yiVHXpye