Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

[Q66-Q85] Use the best ways of preparing for AACE-PSP Exam Dumps with DumpTorrent AACE International AACE-PSP PDF Dumps [2022]

Share

Use the best ways of preparing for AACE-PSP Exam Dumps with DumpTorrent AACE International AACE-PSP dump PDF [2022]

AACE International AACE-PSP exam candidates will surely pass the Exam if they consider the AACE-PSP dumps learning material presented by DumpTorrent.

NEW QUESTION 66
Resource planning must take all of the following into account except for

  • A. Time available to complete the project.
  • B. Earned value techniques established for the project.
  • C. Cash flow (expenditure) limitations for completing work on the project.
  • D. Types of materials, equipment and labor skills required to complete the project.

Answer: B

 

NEW QUESTION 67
Total float is defined as the amount of time an activity can be delayed without impacting

  • A. The buoyancy of a successor activity
  • B. The end of that activity
  • C. The next activity
  • D. The overall project completion

Answer: D

 

NEW QUESTION 68
By subtracting a measured unit productivity rate during an impacted period from the unit productivity rate during an unimpacted period, the resulting value represents:

  • A. Acceleration.
  • B. Production output.
  • C. Productivity efficiency.
  • D. Productivity loss.

Answer: D

 

NEW QUESTION 69
Determine the correct formula and date for the late finish for Activity 2002.

  • A. LS.2003 - 1 day -> 11.06.01.
  • B. LS.2003 + 1 day -> 10-07-01.
  • C. LS.2003 - 1 day -> 10-06-01.
  • D. LS.2003 - 1 day -> 10-05-01.

Answer: D

 

NEW QUESTION 70
What owner action could have mitigated the late completion of the project?

  • A. Hire a more senior project manager.
  • B. Self-perform more of the work.
  • C. Prepare better structural steel drawings.
  • D. Use a procurement agent to monitor and expedite equipment deliveries.

Answer: D

 

NEW QUESTION 71
Why does activity 11001 not show successor activities?

  • A. It is the final activity for the required work for the project
  • B. The early finish and late finish are circular
  • C. The scheduler forgot to add the successor activities
  • D. It is the penultimate work required for the project

Answer: A

 

NEW QUESTION 72
Estimate to complete (ETC) is __________________.

  • A. The costs actually incurred in accomplishing the work performed
  • B. The value of the completed work expressed in terms of the budget assigned to that work
  • C. The expected remaining cost needed to complete an activity, group of activities or the project
  • D. The expected total cost of an activity, group of activities or the project

Answer: C

 

NEW QUESTION 73
Assuming a total of 30 lifts per crane per day, what is the maximum number of lifts that could be accomplished using 3 small tower cranes over a 5-day period?

  • A. 150 lifts
  • B. 450 lifts
  • C. 300 lifts
  • D. 45 lifts

Answer: B

 

NEW QUESTION 74
Activity C is a

  • A. Continuous activity.
  • B. Contentious activity.
  • C. 1-day activity.
  • D. Milestone.

Answer: D

 

NEW QUESTION 75
You are retained by a contractor who asks you to perform a simple as-planned versus as-built analysis (APAB) of a large hydro-electric dam project that took more than five years to complete. Your analysis will form the basis of a change order that requests a time extension. You suggest using a different methodology for quantifying the delay. Which of the following reasons for recommending a different analysis does NOT apply to a simple APAB analysis?

  • A. Accuracy is increased by inserting delaying events into the as-planned schedule.
  • B. Less accurate as the analysis advances through the project.
  • C. Not suitable for projects with long durations.
  • D. Not suitable for complicated projects with multiple planned critical paths.

Answer: A

 

NEW QUESTION 76
What is the relationship depicted between Activity G and Activity H?

  • A. Finish-to-start.
  • B. Start-to-start.
  • C. You cannot tell with the supplied information.
  • D. Finish-to-finish.

Answer: B

 

NEW QUESTION 77
Under which circumstance should one perform resource-leveling calculations?

  • A. When the contract contains a provision for float-banking.
  • B. Never, unless required by the contract.
  • C. When the schedule is resource-loaded.
  • D. When you believe that known resource limitations may override schedule logic.

Answer: D

 

NEW QUESTION 78
Of the following update procedures, which is the least important in achieving an accurate forecast for completion of a construction schedule?

  • A. Entering the time impacts of delays and change orders.
  • B. Estimating remaining durations of activities.
  • C. The correct recording of actual start dates.
  • D. Making "downstream" logic revisions as required.

Answer: D

 

NEW QUESTION 79
In its simplest form, what is the main drawback of critical path method scheduling?

  • A. It doesn't account for interdependent between activities.
  • B. It assumes that resources are unlimited.
  • C. It requires a backward pass to calculate late dates.
  • D. It allows for Precedence Diagramming Method to be used in place of Arrow Diagramming Method.

Answer: B

 

NEW QUESTION 80
The linear scheduling velocity diagram has the following two-axis:

  • A. Location and crew size
  • B. Time and crew size
  • C. Time and rate of progress
  • D. Time and location

Answer: C

 

NEW QUESTION 81
What is the free float for Activity F?

  • A. 3 months.
  • B. 1months.
  • C. 2month.
  • D. 0months.

Answer: D

 

NEW QUESTION 82
Assuming that you had only one crane capable of 30 lifts per day, 3 column pours requiring 28 lifts each, plus associated assorted work requiring an additional 150 lifts, what is the minimum planned working duration for this work?

  • A. 18 work days
  • B. 7 work days
  • C. 8 work days
  • D. 15 workdays

Answer: C

 

NEW QUESTION 83
What was the original planned duration for Activity A through Activity G?

  • A. 26.
  • B. 24.
  • C. 25.
  • D. 28.

Answer: D

 

NEW QUESTION 84
At the end of month one, did the delay to the parking structure foundation delay the project?

  • A. Yes, by 9 calendar days.
  • B. Yes, by 14 calendar days.
  • C. NO.
  • D. Yes, by 4 calendar days.

Answer: D

 

NEW QUESTION 85
......

Full AACE-PSP Practice Test and 120 unique questions with explanations waiting just for you, get it now: https://drive.google.com/open?id=1SRZaRpMffR-F8ydZlgYwU4pyJTFvoWRS

Accurate & Verified Answers As Seen in the Real Exam here: https://www.dumptorrent.com/AACE-PSP-braindumps-torrent.html